Crossroads College Preparatory

Owner Crossroads College Preparatory School
Architect TR,i
Construction Manager Lawlor Corporation
Design Build Mechanical icon Mechanical
Value of icon's Work $800,000

icon Mechanical served as the Mechanical Contractor for this LEED Platinum project. This project consisted of new science labs and library spaces, and renovation of the classrooms and music rooms in the existing building.

Crossroads College Preparatory School is the 4th building in the Saint Louis area to receive the LEED Platinum Certification and is one of 2 LEED Platinum projects completed by icon Mechanical. Crossroads is the first LEED certified K-12 school building in the St. Louis metropolitan region and is the only K-12 LEED Platinum certified school in the Midwest. Crossroads is one of only six schools in the nation to earn such a distinction.

To meet the requirements to gain the LEED Platinum certification the Crossroads project utilized 4 Daikin variable refrigerant volume heat recovery systems.

The project also included a solar hot water heating system installed by icon mechanical that provides most of the domestic hot water for the new addition.

To meet the outdoor air requirements a roof top unit that included an energy recovery wheel was utilized.

icon Mechanical collaborated with the project’s Engineer, Construction Manager, and LEED consultant to ensure the project’s goal of obtaining LEED Platinum Certification was met.