Distillation Column Removal & Replacement

USVI
Owner Confidential
Design Build Mechanical icon Mechanical

icon Mechanical was engaged to remove an existing, 100-foot distillation column and subsequently install the replacement. The new column was fabricated in Europe under icon’s guidance and flown to the USVI in one of the world’s largest aircrafts.

icon managed the logistics from the airport to the job site and successfully installed the new replacement column, besting client expectations.